30Hatch has integral structure of manhole cover and fall prevention fence. 30Hatch can be completed within "30 seconds" by sliding out with one hand. The completed safety fence will be the hold for entry into and leaving from a pit.
Equipped with balanced weight, it helps you to lift up manhole cover and safety fence with extremely light force.(within 15kgf)
|
![]() Being opened |
|
![]() Completed |
| Description | Design range |
|---|---|
| Manhole shape | Round ○ or Square □ |
| Opening size | φ600~900mm □600~1,000mm |
| Manhole depth | 2,000mm~ |
| Construction | Aluminum |
| Max. load | 4.9~14.7 kN/m2 |
| Others | Can be designed for new construction or retrofit/replacement. |
Substation
Substation
Pump station
Substation
Hydraulic power station
Pump station(C)ANANDENKI CO., LTD. ALL RIGHTS RESERVED.